01Manufacturing

Manufacturing Capability You Can Verify

Production takes place at the Ningbo site: tank moulding, motor machining, assembly, water testing, running-in and packing. The figures below are given with their measurement basis rather than as a single headline number.

Factory building exterior with loading area at the production site
02Scale

Plant figures and basis

Area and capacity are different measurements; they are kept separate so a figure is never read as output.

Plant area

12,000m²

According to company data

Building area

15,000m²

According to company data

Designed capacity, single line

80,000units / year

Design figure, not output. Consistency with published material to be confirmed

03Process

Six steps from part to carton

Each step happens on the same site; the sequence is the order used on the line.

  1. 01

    Incoming inspection

    Motor, impeller and tank parts are checked against the drawing before they enter the line.

  2. 02

    Moulding and machining

    Tank moulding and motor machining are carried out in-house on the same site.

  3. 03

    Assembly

    Pump, float control and electrical chamber are assembled and wired as one unit.

  4. 04

    Water test

    Each unit is run in a water bench to check flow, head and float switching.

  5. 05

    Running-in

    Units run for a set period to catch seal, noise and start-up faults before packing.

  6. 06

    Packing

    Carton, foam and manual are packed to the export loading quantity for each model.

04Quality

What is checked, and where

Incoming parts

Motor winding resistance, impeller dimensions and tank wall thickness are checked before assembly, per the factory inspection routine.

Water test bench

Each assembled unit is run in water to confirm flow, head and float switching before it leaves the line.

Running-in and packing

Units run for a set period to catch seal and noise faults, then are packed with manual and foam to the export quantity.

Water testing bench used to verify flow and head of assembled units
Water test bench
Cartons stacked in the warehouse before container loading
Packed stock before loading
Inspection records pending

Calibration documents and inspection record formats are released once the factory file is confirmed.

05Export

How the range is supplied

Two electrical platforms

50Hz and 60Hz units are produced as separate platforms with their own windings, so a market can be supplied without converting a 50Hz design.

Packing for container loading

Carton quantity, carton size and 20GP / 40GP / 40HQ loading are recorded per model and quoted with each order.

Documentation

Catalog, optional datasheet and certificate copies are released as each document completes verification.

Structure and service access

Water and electrical chambers are separated so the motor stays out of the wastewater volume; the float control, impeller and motor assembly are reachable without cutting the discharge line. Factory profile documents covering these points are being prepared for release.

Next

Ask for the current factory file

Ningbo Chixiang Electromechanical Tech Co., Ltd. · No.518 Yindong North Road, Yinzhou, Ningbo, China

Get a Quote